They transport railway equipment for work on the Mayan Train project

September 14, 2021.

A total of 4,288 tons of rail equipment were imported from Mombasa, Kenya, arriving at the port aboard the B / C UNIVISON and B / C UNISEA.

Through the Port of Coatzacoalcos, the teams are embarking to be transferred by land to the Palenque-Escarcega section 1, which includes the states of Chiapas and Campeche.

As part of the logistics and because the equipment represented a temporary import; The 8 locomotives, 28 gondolas, crane equipment, generators and accessories as a whole were sheltered in 6,090m2, areas destined to cargo in transit.

The Coatzacoalcos port area has 170,000m2 for the storage of various cargo, in addition to 9 docks and in front of docks for the proper loading and unloading of various cargoes.